UST Inc. Is Working on a Complex Construction Project in Kazakhstan
The authorities of Almaty region are interested in the integration of transport and infrastructure solutions from Unitsky String Technologies Inc. into the regional infrastructure. The company's experts have started to develop a preliminary design. The string rail overpass may connect the regional town of Kaskelen and the future metro station near Barlyk market in Almaty, which will solve the problem with hours-long traffic jams.
In cooperation with the regional administration, UST Inc. developed an 11.8 km route. Today, this section has become a source of pressing problems, such as a huge flow of cars as part of pendulum migration and many hours of traffic jams. There are no streetcars here, not enough buses, and no subway network. At the same time, passenger traffic in this direction reaches 180,000 passengers per day.
Local authorities are expressing interest in the product from UST Inc. that can solve logistical problems, optimize transportation and unburden the transport infrastructure. The company’s solutions are uST complexes that allow uPod vehicles to travel on a special overpass above ground, avoiding accidents and traffic jams. At the same time, the above-ground design of the track structure makes it possible to create a route along an optimal trajectory, which will reduce travel time and help redistribute passenger traffic.
"The implementation of uST technologies will optimize transportation on the Kaskelen–Barlyk route and relieve the transport infrastructure of the Almaty region. It is a safe, environmentally friendly, and cost-effective solution compared to conventional types of transport. uST complexes can operate 24/7 in any weather conditions such as snow, ice, strong winds, or heavy rain. By entrusting passenger transportation to it, you will ensure safety, cost-efficiency, and guaranteed uninterrupted operation for many years," notes Nadezhda Kosareva, CEO at Unitsky String Technologies Inc.
For uninterrupted passenger transportation, UST Inc. offers its flagship uPod, the U4-212 Karat uBus. During rush hour, a uST complex will be able to transport up to 5,300 people (31 uPods per line) in one direction. The average travel speed will be about 112 km/h. A passenger will get from one terminus to the other in 6 minutes. According to preliminary calculations, the fare will be up to 300 tenge. Even with such a low ticket price, comparable to the cost of a cab fare, all the costs of construction of the complex can be recouped within 10 years due to the high efficiency of the engineering solutions used in the project.
More news

News
23 November 2023
A boarding platform on the 2 km long overpass is being built at uSky Center
The platform is the most simple and functional construction consisting of a reinforced concrete base with a metal structure placed on it for the passengers’ embarkation and disembarkation.

Blog
16 August 2024
Global Traffic Congestion on the Rise: uST Complexes Are the Solution to Traffic Jams in Megacities
Traffic studies for 2023 show that congestion continues to rise, leading to increased time spent idling in traffic.

Blog
8 November 2024
Safe and Effective in Every Season: How uST Transport Defies Weather Conditions
uST transport effectively overcomes these seasonal challenges.